DGCP™ Record — DGCP-0090
Publication Date: 2026-06-01 (Asia/Bangkok)
Event Date: 2026-06-01
Project: MaMeeFarm™
Framework: DGCP™ — Data Governance & Continuous Proof
Role: Global Standard Setter
Document Type: DGCP™ Record Standard v1
Mode: Observation only • Operational continuity • No prediction • No advice
Scope Note: Water Extraction • Water Transfer Infrastructure • Storage Tank Operation • Water System Observation • Traceability Continuity
Location: MaMeeFarm (Primary DGCP Site)
Record Identification
- Record ID: DGCP-0090
- Timezone: Asia/Bangkok
- Record State: Active
Operational Activity
- water extraction and storage transfer workflow observed
- underground water well infrastructure documented
- water pump deployment recorded for extraction operations
- water transfer pipeline connection preserved
- water transfer to elevated storage tanks documented
- water overflow condition observed following storage fill operation
Asset Observation
-
Underground Water Well:
WT-UW-0001 -
Underground Water Well:
WT-UW-0002 -
Water Pump:
HZ-PMP-0003 -
Elevated Water Storage Tank:
WT-H-0001 -
Elevated Water Storage Tank:
WT-H-0002
Zone Reference
- HZ-02
Operational Observation
- underground water well infrastructure documented
- water pump deployment recorded for extraction operations
- water transfer pipeline connection observed
- water transfer to elevated storage tanks documented
- water overflow condition observed following storage fill operation
Structural Observation
Observed Condition:
- water extraction workflow preserved through operational documentation
- water transfer continuity maintained between source and storage infrastructure
- storage tank filling process documented under operational conditions
- overflow condition preserved following storage completion
- append-only observation chain maintained
Evidence Reference
- Video Documentation (~15 seconds)
Linked Proof Sequence
- Proof 1180
- Proof 1181
- Proof 1182
- Proof 1183
- Proof 1184
Integrity Statement
Forward-only record
No retroactive edit
Sequence continuity maintained
DGCP™ Structural Note
This record is maintained under DGCP™ as a structured operational continuity entry.
Observation structure preserved.
No narrative interpretation included.
No predictive classification applied.
Author: P’Toh
Role: System Architect — DGCP™