DGCP™ Record — DGCP-0113
Publication Date: 2026-06-24 (Asia/Bangkok)
Event Date: 2026-06-24
Project: MaMeeFarm™
Framework: DGCP™ — Data Governance & Continuous Proof
Role: Global Standard Setter
Document Type: DGCP™ Record Standard v1
Mode: Observation only • Operational continuity • No prediction • No advice
Scope Note: Field Monitoring • Water Infrastructure Observation • Environmental Monitoring • Access Control Verification • Traceability Continuity
Location: MaMeeFarm (Primary DGCP Site)
Record Identification
- Record ID: DGCP-0113
- Timezone: Asia/Bangkok
- Record State: Active
Operational Activity
- field monitoring and infrastructure observation workflow documented
- water presence verified within FZ-05-CANAL-0001
- animal observation recorded within FZ-04
- environmental conditions documented using HTC-2
- access control and water availability observations completed
Asset Observation
-
Water Infrastructure Asset:
FZ-05-CANAL-0001 -
Animal Asset:
ANM-DOG-GROOP -
Environmental Sensor:
HTC-2 -
Infrastructure Asset:
INF-GATE-0003 -
Water Infrastructure Asset:
WT-UW-0001-0002
Zone Reference
- FZ-05
- FZ-04
- FZ-03-T1
- HZ-02
Operational Observation
- water observed within canal section FZ-05-CANAL-0001 during field inspection
- one dog observed within FZ-04 near canal area
- HTC-2 recorded indoor temperature 28.6°C, outdoor temperature 28.2°C, and relative humidity 75%
- INF-GATE-0003 observed in closed position following field activities
- water surface remained visible within WT-UW-0001-0002 during inspection
Structural Observation
Observed Condition:
- water availability observations documented across multiple farm locations
- environmental monitoring preserved through HTC-2 sensor records
- access control status documented through infrastructure observation
- field inspection workflow preserved through sequential observations
- append-only observation chain maintained
Evidence Reference
- Video Documentation (~15 seconds)
Linked Proof Sequence
- Proof 1295
- Proof 1296
- Proof 1297
- Proof 1298
- Proof 1299
Integrity Statement
Forward-only record
No retroactive edit
Sequence continuity maintained
DGCP™ Structural Note
This record is maintained under DGCP™ as a structured operational continuity entry.
Observation structure preserved.
No narrative interpretation included.
No predictive classification applied.
Author: P’Toh
Role: System Architect — DGCP™