DGCP™ Record — DGCP-0115
Publication Date: 2026-06-26 (Asia/Bangkok)
Event Date: 2026-06-26
Project: MaMeeFarm™
Framework: DGCP™ — Data Governance & Continuous Proof
Role: Global Standard Setter
Document Type: DGCP™ Record Standard v1
Mode: Observation only • Operational continuity • No prediction • No advice
Scope Note: Mango Tree Observation • Crop Condition Monitoring • Harvest Activity • Biological Observation • Traceability Continuity
Location: MaMeeFarm (Primary DGCP Site)
Record Identification
- Record ID: DGCP-0115
- Timezone: Asia/Bangkok
- Record State: Active
Operational Activity
- mango tree observation and biological monitoring workflow documented
- mango tree condition verified during routine inspection
- crop feeding damage documented on one fruit
- mango harvest activities completed
- insect and bee colony observations recorded
Asset Observation
-
Agricultural Asset:
PLT-MNG-0001
Zone Reference
- HZ-02
Operational Observation
- mango tree PLT-MNG-0001 observed during routine field inspection
- one mango fruit observed with visible feeding damage
- mango fruits harvested during routine agricultural activities
- unidentified insects observed on the trunk of PLT-MNG-0001
- bee colony observed attached to a branch of PLT-MNG-0001
Structural Observation
Observed Condition:
- plant condition documented through routine field observation
- crop condition preserved through feeding damage observation
- harvest activity documented following inspection
- biological observations preserved through insect and pollinator records
- append-only observation chain maintained
Evidence Reference
- Video Documentation (~15 seconds)
Linked Proof Sequence
- Proof 1305
- Proof 1306
- Proof 1307
- Proof 1308
- Proof 1309
Integrity Statement
Forward-only record
No retroactive edit
Sequence continuity maintained
DGCP™ Structural Note
This record is maintained under DGCP™ as a structured operational continuity entry.
Observation structure preserved.
No narrative interpretation included.
No predictive classification applied.
Author: P’Toh
Role: System Architect — DGCP™