DGCP™ Record — DGCP-0164
Publication Date: 2026-08-14 (Asia/Bangkok)
Event Date: 2026-08-14
Project: MaMeeFarm™
Framework: DGCP™ — Data Governance & Continuous Proof
Role: Global Standard Setter
Document Type: DGCP™ Record Standard v1
Mode: Observation only • Operational continuity • No prediction • No advice
Scope Note: Grass Cutting Equipment • Fuel Preparation • Mixed Fuel • Equipment Refueling • Post-Refueling Condition • Vegetation Management • Grass Cutting Activity • Operational Continuity
Location: MaMeeFarm (Primary DGCP Site)
Record Identification
- Record ID: DGCP-0164
- Timezone: Asia/Bangkok
- Record State: Active
Operational Activity
- grass cutting equipment fuel preparation, mixed fuel, refueling, and vegetation management documented
- fuel preparation documented
- mixed fuel documented
- grass cutting equipment refueling documented
- post-refueling equipment condition documented
- pre-grass-cutting area documented
- post-grass-cutting area documented
Asset Observation
-
Grass Cutting Equipment:
EQP-GRC-0001
Zone Reference
- FZ-03
Operational Observation
- grass cutting equipment EQP-GRC-0001 and fuel preparation materials observed within FZ-03 before fuel mixing and refueling activity
- prepared fuel mixture of Gasohol 95 and 2T oil observed within FZ-03 for use with EQP-GRC-0001
- prepared Gasohol 95 and 2T fuel mixture observed during refueling of EQP-GRC-0001
- EQP-GRC-0001 observed after refueling with the fuel tank cap in the closed position
- vegetation within FZ-03 and EQP-GRC-0001 observed before grass cutting activity
- vegetation within FZ-03 observed after grass cutting activity using EQP-GRC-0001
Observed Values
Fuel Preparation:
- Operation Stage: Fuel Preparation
- Grass Cutting Equipment Present: Yes
- Fuel Preparation Materials Present: Yes
Mixed Fuel:
- Fuel Type: Gasohol 95
- Oil Type: 2T
- Mixed Fuel Present: Yes
Refueling:
- Refueling Activity: Observed
- Fuel Type: Gasohol 95 + 2T
Post-Refueling:
- Operation Stage: Post-Refueling
- Fuel Tank Cap Position: Closed
Pre-Grass Cutting:
- Operation Stage: Pre-Grass Cutting
- Grass Cutting Equipment Present: Yes
Post-Grass Cutting:
- Grass Cutting Completed: Yes
- Operation Stage: Post-Grass-Cutting
Structural Observation
Observed Condition:
- grass cutting equipment fuel preparation documented
- fuel preparation materials documented
- Gasohol 95 and 2T mixed fuel documented
- grass cutting equipment refueling activity documented
- post-refueling equipment condition documented
- closed fuel tank cap position documented
- pre-grass-cutting vegetation condition documented
- post-grass-cutting vegetation condition documented
- equipment preparation, refueling, and vegetation-management sequence documented
- source asset continuity preserved through the observation sequence
- append-only governance chain preserved
Evidence Reference
- Video Documentation (~15 seconds)
Linked Proof Sequence
- Proof 1566
- Proof 1567
- Proof 1568
- Proof 1569
- Proof 1570
- Proof 1571
Integrity Statement
Forward-only record
No retroactive edit
Sequence continuity maintained
DGCP™ Structural Note
This record is maintained under DGCP™ as a structured operational continuity entry.
Observation structure preserved.
Fuel preparation materials, Gasohol 95 and 2T mixed fuel, equipment refueling, post-refueling condition, and pre- and post-grass-cutting vegetation conditions retained as documented.
Source asset continuity was preserved across the fuel preparation, refueling, and vegetation-management sequence involving EQP-GRC-0001 within FZ-03.
The fuel tank cap was observed in the closed position following refueling.
No narrative interpretation included.
No predictive classification applied.
Author: P’Toh
Role: System Architect DGCP™